Archway Interreg
This area of the site contains important documentation from
project meetings.
Conservation , Protection & Enhancement Theme
- Archway
Scoping Questionnaire for Conservation1 (455kb)

- Archway-denBosch-DMBPresentation.ppt
Powerpoint (721kb)
- The management of the
archaeological heritage - Rick van der Ploeg (38kb)

- Speech
Alderman Ms Jetty Eugster - Councillor responsible for Spatial
Development and Fortifications (18kb)

- Fortified City's
Hertogenbosch (705kb)

- Conclusion Den Bosch
Workshop Powerpoint (467kb)
- Concluding Session
Conservation 22 April 2005 Slides (182kb)

- Minutes workgroup
Conservation 1 June 2005 (100kb)

- Nota Belvedere
english

- Conservation
position paper

- Preparation
workshop Conservation December

- Reaction
Preparation Conservation December

Transport Theme
- Archway
Scoping Questionnaire for "Transport and Traffic"
Theme (400kb)

- Malta Conclusions Summary
Powerpoint (102kb)
- dmbeditstafracesection3draft

- Transport Objectives
Gozo

- Attendance
list Valletta November- Transport

- Transcript
Transport Theme June 2005

-
BASELINE QUESTIONNAIRE FOR CONSERVATION &
TRANSPORT (Excel)
Spatial Planning Theme
- Archway
Spatial Planning Questionnaire-eng (20kb)

- Archway
Spatial Planning Questionnaire RESPONSESeng (871kb)

- Spatial Planning CONCLUDING SESSION (7kb)

- PROPUESTA
INTERREG IIIC Spatial Planning

- Spatial
Planning Workshop 1 CONCLUDING SESSION

- Arabarri
Transcript of Workshop 1

- DRAFT Good
Practice Guide Moving on to completion (Powerpoint)
2nd workshop Spatial planning / Archway 15.03.
- 18.03.06 at Arabarri
- Social Diversity,
Collectivity and Balance The Housing Problem Chester (88kb)

- Outlying, transition and
conflictive spaces Chester Conflict Spaces (2mb)

- Presentation:
Town of Lörrach -cooperation networks of towns -cooperation between
towns and territory (2mb)

- Spatial Planning Good
Practice Guide

- Archway tekst ARRABARI
ANG

Interreg IIIC Bid and Progress Reports
- 3W0083N
- ARCHWAY- PR 2 revised June 2005 (Word)
- ARCHWAY-1st-
Progress Report (Excel)
- Archway App form
revised 251004 (Excel)
- 3W0083N
ARCHWAY PR 3 revised January 2006

- 3W0083N ARCHWAY PR4
June2006
- ARCHWAY-3W0083N-PR7Feb2008revised
- May08 (Excel)
- Archway-3W0083N-Final-Report.doc (Word)
Steering Group Meetings
- 1st
Steering Group meeting -Chichester (Word)
- 2nd Steering
Group agenda (Word)
- 3rd Steering Group
agenda (Word)
- Minutes 2nd Steering
Group. (Word)
- Archway
Arabarri 3rd Steering Group Meeting

- Archway
Arabarri Steering Group Meeting

- Minutes
4th steering group meeting Piran

- 5th Progress
Report
Piran Tourism Development and Visitor Management - April
2006
-
Organisation for tourism at the local level in Lörrach and
region

- Tourism
Development and Visitor Management
(QUESTIONNAIRES)

- Piran
WS1 comparison tourist demand
- Piran WS1 David
Bruce intro
-
Legacy Conference powerpoint presentation for Piran
-
Piran WS1 Piran History tourism development Piran
- Piran WS1
s'Hertogenbosch
- Piran
WS1 Carrying Capacity Dr.Jurincic
- Piran WS1
Chester Visitor Management